Workforce Planning and Shift Scheduling

Calculate how many people a production area needs and staff the shifts. 8 parts in three blocks, from the program in hours and the net working time to shift model comparison, rolling patterns, qualification coverage, the measure ladder for peaks and six key figures.

Most production areas carry a head count that came from history. The program grows by a sixth, the absence rate changes, a new product needs a different work content, and the staffing stays where it was until the gap shows up as overtime, agency hours and late deliveries. This series calculates it instead. One worked example, an assembly area for electric drive units with eight stations and a program of 240,000 units, runs through the whole sequence: units and work content become 31,500 productive hours, a measured utilization of 90 percent makes them 35,000 attendance hours, and 205 net attendance days per employee turn those hours into people. Five shift models are compared on hours, load, cost and burden, and the chosen one gives posts, crew sizes from the attendance factor, a rolling pattern published three weeks ahead and two rostered floaters a day. Qualification coverage decides which stations a night shift can run, a measure ladder with a cost per hour handles the peaks, and six key figures keep the result. Work content and capacity verification belong to work measurement, the program and its sequence to production planning and control, and the levels themselves to the qualification matrix. Working time rules, agreements, co-determination and premium rates are named as checkpoints for the responsible function at your site; every rate and band in the example is a freely chosen example value, and this series is not legal advice.

8 parts

Newsletter

One Lean idea.
Every two weeks.