A shift model gives you posts. A shift plan gives those posts names, for months ahead. Between the two sits the attendance factor.
Crew size is posts divided by the attendance factor
Model 03 of area A2 needs 20 station posts per day: eight on the early shift, eight on the late shift and four on the night shift. With an attendance factor of 82 percent, a crew that has to cover eight posts needs 8 / 0.82 = 9.8 people on its list.
| Crew | Posts to cover | Nominal size | Rostered |
|---|---|---|---|
| A early and late, rotating weekly | 8 | 9.8 | 10 |
| B early and late, rotating weekly | 8 | 9.8 | 10 |
| C night shift, four stations | 4 | 4.9 | 6 |
| Total | 20 | 24.4 | 26 |
Crew C carries two people more than its nominal size, so that two can rotate into a day crew every fourth week without opening a night post. The difference between 24.4 and 26 is the floater capacity: 1.6 positions per shift, which the roster turns into two named floaters per day.
The pattern is a promise
A rolling pattern is written as a table that an employee can read without a planner, and the dates of the next twelve months are derived from it:
| Week | Crew A | Crew B | Crew C |
|---|---|---|---|
| 1 | Early | Late | Night |
| 2 | Late | Early | Night |
| 3 | Early | Late | Night |
| 4 | Late | Early | Two people rotate into a day crew |
Four rules make a pattern hold. One pattern per area, written down. A roster published a fixed number of weeks ahead, three in A2, with every change after publication counted and given a reason. Swaps allowed when qualification and rest are intact, and recorded. One review a year with the crews.
Fairness is measurable
The argument about who works which shift ends when the counting starts. Three figures per employee and year, balanced by a written rule:
| What to count | Why | Spread allowed in A2 |
|---|---|---|
| Night weeks | An unbalanced count is the most common reason to leave | 2 weeks |
| Late weeks | Late shifts hit family life hardest in many teams | 3 weeks |
| Weekend shifts | A published rotation list removes the argument | 2 shifts |
A fourth figure belongs beside them: short-notice changes per employee and year, with a target below six. It is the figure the team feels most and planners see least.
What a floater is
A floater is a named position in the roster for every shift, held by someone qualified at level 3 or higher on at least four stations, and assigned to a post in the daily staffing round. Not whoever has the fewest tasks that morning, not a new employee still learning one station, and not an overtime hour booked after the station has already stood still.
How many the area needs follows from the short-term absence rate of 4.8 percent. Across 20 posts that is 0.96 absences on an average day, so one floater covers the normal day. The second covers training on the job, the peak days inside a month and the area tasks of the shift.
Why the allowance is not a reserve to be saved
The 1.6 positions look like a margin on paper, and in every cost round somebody proposes to remove them. Removing them does not remove the absence. It moves the cost from a planned hour at EUR 38.00 to an overtime hour at EUR 47.50, or to a post that stands empty and has to be recovered later at roughly three paid hours for every hour lost.