What usually gets in the way
- The weekly plan changes every day and nobody trusts it.
- Breakdowns and long changeovers eat the capacity.
- Every shift works a little differently.
- Stock grows while some parts are still missing.
1 Start: read and score
Read the series on production planning, standard work and TPM, and score your area with the free checklists.
Read first
- Production Planning and Control (series)
- Visual and Shop Floor Management: See the Status, Act the Same Day (Production System series)
- Standard Work: The Current Best Way, Written Down (Production System series)
- TPM: Equipment That Runs When You Need It (Production System series)
- Flow and Just in Time: Make Material Move to the Customer's Beat (Production System series)
Free checklists
- Production Planning and Control Quick Start Checklist
- Visual and Shop Floor Management Quick Start Checklist
- Standard Work Quick Start Checklist
- TPM Quick Start Checklist
- Flow and Just in Time Quick Start Checklist
2 Build: the first 30 days
Start with the Starter Kit for production planning: load per work center, the bottleneck and a release rule. Add standard work at the bottleneck next.
- Production Planning and Control Starter Kit (EUR 29)
- Visual and Shop Floor Management Starter Kit (EUR 29)
- Standard Work Starter Kit (EUR 29)
- TPM Starter Kit (EUR 29)
- Flow and Just in Time Starter Kit (EUR 29)
3 Master: the complete system
The Production Manager Bundle covers planning, the shop floor meeting cascade, standard work, TPM and flow.
Bought one by one, the 5 complete bundles cost EUR 995. The Production Manager Bundle costs EUR 599.




