Skip to content
Production Leveling
Production Planning

Production Leveling

Smoothing production volume and mix over time to reduce variability and stabilize resource demand.

If weekly demand is 500 of product A and 250 of B, a leveled plan makes 100 of A and 50 of B each day instead of all of A first. Upstream processes and suppliers see steady demand. Leveling requires short changeovers and usually a small finished goods buffer.

Examples

  1. 01Through production leveling, the line builds a fixed mix of 4 models every hour instead of one model per day.
  2. 02Planning checks production leveling against component supply, because a level mix needs every part every day.
  3. 03Production leveling cuts finished-goods stock by 30 % and makes daily demand on suppliers more stable.

Related terms

Newsletter

One Lean idea.
Every two weeks.