TEEP
Total Effective Equipment Performance
Total effective equipment performance: OEE measured against all calendar time, showing the capacity left in unused shifts.
Formula
TEEP = OEE × Utilization
Utilization = Planned production time / Calendar time
Worked examples
- 01Press line on two shifts, 5 days: OEE 68%, 80 planned hours of 168 calendar hours. Utilization 47.6%. TEEP = 68% × 47.6% = 32.4%.
- 02Machining center on three shifts, 5 days: OEE 62%, 120 planned hours of 168 calendar hours. Utilization 71.4%. TEEP = 62% × 71.4% = 44.3%.
- 03Bottleneck furnace, 7 days, 24 hours: OEE 81%, 168 planned hours of 168 calendar hours. Utilization 100.0%. TEEP = 81% × 100.0% = 81.0%.
Pitfalls
- TEEP is a capacity measure, not a performance measure for the team on the shift.
- Calendar time must be the same basis for all machines you compare.