The time from the last good part of one product to the first good part of the next, at full speed and quality.

Formula

Changeover time = Time of first good part (new) - Time of last good part (old)

Worked examples

  1. 01Press changeover measured from last good part to first good part: 48 minutes, of which 31 minutes internal and 17 minutes of waiting for the die cart. After moving preparation outside: 24 minutes, a reduction of 50%.
  2. 02Injection molding: 6 changeovers per day at 35 minutes = 210 minutes, 15.6% of 1,350 available minutes. Halving the time gains 105 minutes per day.
  3. 03Lot size effect: two changeovers of 40 minutes per day cost 80 minutes. Halving the lot size means four changeovers and 160 minutes. With a changeover time of 20 minutes, four changeovers again cost 80 minutes: half the lot size at the same capacity.

Pitfalls

  • Stopping the clock at the first part instead of the first good part hides the adjustment loss.
  • Averages hide the long changeovers; track the distribution.