Factory Layout Planning
Plan a layout with numbers instead of opinions. 8 parts in three blocks, from goals, data and the from-to matrix to relationships, space balance, ideal and real layout, variant evaluation, detailed planning and the move.
Most layouts were never planned as a whole. They grew machine by machine, and each machine went where space was free. The result is long ways, stock in every corner and a request for an extension while a tenth of the floor is distance turned into buffers. This series follows one worked example, a plant for pump units with a hall of 4,800 square meters, through the whole method of layout planning: goals and data, the from-to matrix and transport effort in meters times transports per day, the relationship rating, space requirement and space balance, the ideal layout and the real layout with its fixed points, variants compared by utility analysis, transport effort and investment, the detailed planning of workstations, aisles and staging areas, and the move itself. The hall goes from 14,100 to 7,980 meters of transport per day and finds the space for its growth inside its own walls. How material is supplied with tugger trains and supermarkets is covered separately under Intralogistics and Material Flow.
Block 1Data and Material Flow
Block 2Space and Layout
Block 3Decide and Realize
No part found. Try a shorter word.